Modern Spanish Construction: Part II » spanish_const_13

May 27th 2009

July 10, 2000 - 8:40 am

July 10, 2000 – 8:40 am

Here is a better shot of the floor beam rebar and formwork. No formwork is setup against the two adjacent buildings. A one inch piece of foam will be set against the building before the floor is poured. An edge form is set up around the elevator shaft and the building perimeter.